Home / Experience
Case study

2,400 full truckloads coordinated nationwide in roughly three months.

A beverage-manufacturer project requiring fast multi-location movement, receiving coordination, and documented disposition.

The operating challenge

High volume without losing control of the details.

The project required transportation, scheduling, receiving, and final disposition to stay connected across a nationwide footprint. WasteSmart coordinated the moving parts through one operating team.

Approximately 2,400 full truckloads
53-foot van-scale movements
Nationwide coordination
Roughly three-month execution window
Pickup-to-receiving coordination
Disposition documentation tied to movement
WasteSmart branded freight trailer
What buyers should take from it

WasteSmart is built for specialized projects where scale and accountability matter at the same time.

One operating team

Transportation, receiving and disposition remained connected rather than split between unrelated vendors.

Nationwide execution

The model scales beyond a single local facility when a manufacturer needs consistent handling across markets.

Proof after processing

Disposition records can be provided after processing so the customer can close out the material internally.

Discuss a specialized project